TT - Application on Worktops & Splashbacks (ENG)
How to build up Topciment on a worktop and splashback, from reinforcement to the finished sealer.
Updated
by tomas martinsson
Guide / Worktops
Application: Worktops & Splashbacks (Topciment)
Guide for build-up and workflow when applying Topciment microcement onto worktops and splashbacks.
🛑 Before commencing the project:
• Sample Board: Always prepare a test sample of at least 60×60 cm in the correct color and with a refined texture for client sign-off prior to starting.
• Working Temperature: Ambient and substrate temperatures must be maintained strictly between +10 °C and +25 °C throughout installation and curing.
• Rigid Substrate: The worktop must be completely rigid and stable, with all substrate joints flush and level. Movement in the carcass or substrate board will cause cracking over time.
• Disassembly: Remove sinks, hobs, and tapware prior to starting to ensure proper sanding and consistent application around all edges.
• Sequence of Work: If coating both the worktop and the splashback, always begin with the splashback.
• Sample Board: Always prepare a test sample of at least 60×60 cm in the correct color and with a refined texture for client sign-off prior to starting.
• Working Temperature: Ambient and substrate temperatures must be maintained strictly between +10 °C and +25 °C throughout installation and curing.
• Rigid Substrate: The worktop must be completely rigid and stable, with all substrate joints flush and level. Movement in the carcass or substrate board will cause cracking over time.
• Disassembly: Remove sinks, hobs, and tapware prior to starting to ensure proper sanding and consistent application around all edges.
• Sequence of Work: If coating both the worktop and the splashback, always begin with the splashback.
1. Substrate Preparation & Reinforcement
Instructions: Substrate Preparation on Tiles ↗
Instructions: Primer Selection Guide ↗
Instructions: Fiberglass Mesh Guide ↗
2. Build-up: Microcement
🔒 Tip for Crisp, Clean Front Edges (Final Coat Only):
Tape the front edge when troweling the top horizontal surface. Once the top face has dried, gently sand the edge by hand. Then tape the top face precisely along the front edge and trowel the front vertical edge separately to avoid marks and overlapping ridges.
Tape the front edge when troweling the top horizontal surface. Once the top face has dried, gently sand the edge by hand. Then tape the top face precisely along the front edge and trowel the front vertical edge separately to avoid marks and overlapping ridges.
Instructions: Microbase ↗
Instructions: Microdeck ↗
Instructions: Microfino ↗
Instructions: Sealer Selection ↗
3. Sealing & Topcoats
4. Step-by-Step Workflow & Execution
💨 * Accelerate Drying Using Fans:
Drying intervals for primer and cementitious coats can be shortened using standard air circulators. Never use fan heaters; rapid forced evaporation weakens cement hydration and increases shrinkage cracking risks. Final topcoats must always cross-link naturally.
Drying intervals for primer and cementitious coats can be shortened using standard air circulators. Never use fan heaters; rapid forced evaporation weakens cement hydration and increases shrinkage cracking risks. Final topcoats must always cross-link naturally.
How did we do?
TT - Application on Floors (ENG)