Skip to main content

TT - Sealer & Topcoat System Selection

System Overview / Sealing Sealer & Topcoat System Selection. Overview and guidance for selecting topcoat systems. All resistance against water, stains, and mechanical wear depends entirely on the sea…

tomas martinsson
Updated by tomas martinsson
System Overview / Sealing

Sealer & Topcoat System Selection

Overview and guidance for selecting topcoat systems. All resistance against water, stains, and mechanical wear depends entirely on the sealing process.

🛑 Tool & Application Requirements:
Roller Selection: Always use Microstar 8 mm or Anza Platinum Pro (6–8 mm lint-free microfiber). Using the wrong roller is the single most common cause of claims and finish inconsistencies.
Cross-Rolling: Apply in sections of 1–2 m² wet-on-wet. Roll horizontally with firm pressure first, then vertically immediately after, finishing with a light tip-off stroke in the same direction.

1. Choose the Right Sealing System for Your Project

Topciment System Maximum Durability

Industry-leading polyurethane sealer offering maximum chemical resistance and durability in wet zones.

Topsealer Dragon / WT: Heavy-duty two-component PU topcoat for all interior areas.
TT Presealer: Standard primer (2 coats) for floors and walls that preserves a natural finish.
Topsealer Pro-Plus: Reinforced barrier primer for countertops, tables, and metallic coatings.
Drying Time Between Coats: 18–36 hours (intermediate sanding with 400 grit).
DC Titan System Fast & Vapor-Permeable

Fast-drying and vapor-permeable polyurethane topcoat, particularly recommended for basements and time-critical projects.

Titan Topsealer: Waterborne PU topcoat with fast cure-through properties.
Titan Presealer / Titan Cream: Diluted with 10–20% water. Cream is strongly recommended on bathroom floors.
Time Savings: Only 3–4 hours drying time between topcoat layers. No intermediate sanding required if coat 2 is applied within 8 hours.

2. General Pre-Application Preparations

Thorough Final Sanding: Sand the surface smooth and flat. The sealer adds no build and will highlight all underlying imperfections. Always use low-angle glancing light.
Grit Sizes for Finish Coats: Sand Microdeck with 80 grit (machine) / 120 grit (hand). Sand Microfino with 120 grit (machine) / 240 grit (hand). Sand internal and external corners gently by hand.
Vacuuming: Vacuum the surface using a soft brush nozzle (guard against cable scratches). Then wipe down the entire area with a dry microfiber cloth. All sanding dust must be removed—residual dust darkens immediately under the sealer.

3. Core Application Rules

Edges & Corners: Cut in with a brush only on the immediate section being rolled (approx. 50 cm at a time). Never cut in around the entire room beforehand, as the material will dry and leave visible framing marks.
Walls: Start in an upper corner and work downward. Watch for runs, especially during the second coat when porosity is reduced.
Floors: Start at the farthest point and back out toward the exit in sections of approximately 1 meter. Saturate the substrate thoroughly, but leave no standing puddles.
Surface Protection: Always protect floors when sealing walls, and place protective paper under roller trays during floor application. Drips landing on untreated cement cause permanent stains.
Curing Time & Maintenance:
Foot Traffic / Light Handling: 24–48 hours.
Soft Joints / Silicone: Apply sanitary silicone in material transitions no earlier than 3 days after final topcoat application.
Covering: Do not cover the surface with protective paper or non-breathable plastic during the first 14 days.
Cleaning: Clean with water only during the first two weeks. After this period, only pH-neutral cleaning agents may be used.