Skip to main content

DC - Titan Topsealer (ENG)

Water-based two-component polyurethane sealer for microcement, applied over Titan Presealer or Titan Cream.

tomas martinsson
Updated by tomas martinsson
Product Guide / Topcoat Sealer

Topsealer: Titan Topsealer

Two-component polyurethane sealer. Mixing instructions, roller selection, and application techniques.

🛑 Before You Begin:
‱ Substrate & Cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
‱ Pre-sealing: Never apply the sealer directly onto bare microcement. Always saturate the substrate first with Titan Presealer or Titan Cream.
‱ Rising Damp: We advise against microcement on substrates subject to rising damp. Basement floors must be properly drained, insulated, or completely dry.
‱ Climate & Curing: Ambient room and surface temperatures must remain between +10 °C and +25 °C. The sealer must always cure at room temperature without the use of fans.

1. Roller Selection and Preparation

Important: Roller Selection

Always use an 8 mm lint-free roller, preferably our Microstar roller. Using the wrong roller is the single most common cause of roller lines, uneven film thickness, and compromised surface protection. The vast majority of projects experiencing finish issues used an unsuitable roller.

Characteristics

Waterborne two-component polyurethane sealer with excellent vapor permeability. Ideal for dry basement spaces, on-grade slab floors, and projects with compressed timelines.

Substrate Preparation

If more than 8 hours have elapsed since the surface was pre-sealed with Titan Presealer or Titan Cream, lightly de-nib the surface using 400 grit abrasive paper to ensure mechanical keying. Thoroughly wipe away all sanding dust with a dry microfiber cloth afterward.

2. Mixing

🛑 Critical Mixing Precaution – Component B Spills:
Do not spill or splash Component B onto floors or walls. The hardener will not dry on its own, which prevents subsequent coats from curing on that spot. Always mix on protective masking paper or in a separate preparation area.
Mixing Ratio

5 parts Component A + 1 part Component B + 10% clean water. Shake bottles for approximately 20 seconds prior to dosing. Use the mixing app to calculate exact batch weights.

Mixing Sequence

1. Mix Component A and Component B thoroughly in a clean bucket.
2. Add the water last and stir until the sealer is completely homogeneous.
Adding water before the hardener is thoroughly incorporated will cause the sealer to clump immediately, destroying the batch.

Pot Life

Mixed sealer remains workable for approximately 45 minutes in the bucket.

3. Application and Drying Times

🛑 Critical Application Rules – Direct Sunlight and Floor Protection:
‱ No Direct Sunlight: Never apply in direct sunlight, as excessive heat causes the sealer to dry too fast, resulting in lap lines. Mask off windows or schedule application when direct sunlight does not hit the surface.
‱ Protect Floors in Bathrooms: The floor must be masked off when applying sealer to bathroom walls, especially during the first coat. Drips and spills absorb instantly into raw microcement and leave permanent dark spots. Always place paint trays on masking paper when coating floors.
Cross-Rolling Technique

Cut in internal corners with a brush only directly ahead of the roller to prevent the brushed edge from drying prematurely. Divide the area into 1–2 mÂČ sections and work wet-on-wet to eliminate visible overlap marks:
1. Horizontal Pass: Roll the sealer side-to-side with steady, firm pressure to saturate the surface evenly.
2. Vertical Cross-Pass: Immediately cross-roll the same section top-to-bottom, maintaining firm pressure.
3. Lay-off Pass: Tip off very lightly without downward pressure in a single, consistent direction to smooth out roller texture.
4. Maintain Wet Edge: Continue immediately from the leading wet edge so the fresh material blends seamlessly before it sets. Allowing the edge to dry too long will result in visible lap lines.

Number of Coats and Drying Time

Always apply 2 fully covering coats. Allow the first coat to dry for 3–4 hours before applying the next coat. If more than 8 hours elapse between coats, the surface must be lightly sanded with 400 grit abrasive paper and wiped clean with a dry microfiber cloth before applying Coat 2.

Documents and Technical Datasheets

📄 Technical Documentation: Titan Topsealer
đŸ›Ąïž Health & Safety Equipment & Tool Care:
‱ Protective Equipment: Wear nitrile gloves and safety goggles during all handling and mixing. Ensure adequate room ventilation during application and curing.
‱ Tool Cleaning: Discard roller sleeves after use. Clean paint trays and steel tools immediately with water before the sealer dries, or with acetone or solvent wipes if the sealer has begun to cure.

How did we do?

DC - Titan Presealer / Titan Cream (ENG)

TT - Mixing and Pigmentation (ENG)