TT - Presealer (ENG)

Ready-mixed sealer that saturates the microcement before Topsealer Dragon.

tomas martinsson
Updated by tomas martinsson
Product Guide / Pre-sealer

Topciment — TT Presealer

Instructions for saturating and sealing microcement prior to applying topcoats in the Topciment system.

🛑 Before You Begin:
• Substrate & Cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
• Microcement Drying Time: Apply TT Presealer no earlier than 24 hours after the final coat of microcement has dried.
• Rising Damp: We advise against microcement on substrates subject to rising damp. Basements must be properly drained, insulated, or completely dry.
• Working Temperature: Ambient room and substrate temperatures must remain between +10 °C and +25 °C throughout.

1. Roller Selection and Preparation

Important: Roller Selection

Always use an 8 mm lint-free roller, preferably our Microstar roller. Alternative rollers often cause uneven coverage, roller marks, and compromised final protection.

Thorough Cleaning

Vacuum the surface meticulously with a soft brush attachment (take care that the power cord does not mark the surface). Wipe down the entire area with a dry microfiber cloth. Trapped sanding dust will darken under the sealer, which is especially noticeable on light colors.

2. Application and Drying Times

🛑 Critical Application Rules – Direct Sunlight and Floor Protection:
• No Direct Sunlight: Never apply in direct sunlight, as excessive heat causes the pre-sealer to dry prematurely and develop lap lines. Mask off windows or schedule application when direct sunlight is not hitting the surface.
• Protect Floors in Bathrooms: The floor must be masked off when sealing bathroom walls, particularly during the first coat. Drips and spills absorb instantly into unsealed microcement and leave permanent dark stains. Always place the paint tray on masking paper during floor sealing.
Application Technique

The product is ready-mixed and applied in 2 coats:
• Internal corners and edges: Cut in corners and perimeter edges with a brush only directly ahead of the roller (approx. 50 cm at a time). Never brush all perimeter edges in advance, as the brushed margin will dry and create visible framing lines.
• Walls: Begin in an upper corner and work wet-on-wet. Watch carefully for runs and sags, particularly on the second coat when substrate absorbency is reduced.
• Floors: Start at the point furthest from the exit and work backward in sections of approx. 1 meter, saturating the surface evenly without allowing puddles to form.

Drying Times and Intermediate Sanding

Allow Coat 1 to dry for 3–4 hours at +20 °C before rolling Coat 2 (the roller can be kept sealed in a plastic bag between coats). After Coat 2, allow the pre-sealer to dry for at least 12–24 hours. Always de-nib the surface very lightly with 400 grit abrasive paper and wipe away all sanding dust with a dry microfiber cloth before applying topcoat.

3. Next Steps: Sanding and Topcoat

Once TT Presealer has dried, lightly sand the surface and seal with a topcoat:

Documents and Technical Datasheets

📄 Technical Documentation: TT Presealer
🛡️ Health & Safety Equipment & Tool Care:
• Protective Equipment: Wear protective gloves and safety goggles during all handling. Ensure adequate room ventilation.
• Tool Cleaning: Clean tools and brushes thoroughly with water immediately after use before the pre-sealer dries. For dried residue, clean tools with acetone or wipes.