🛑 Before You Begin:
‱ Substrate & Cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
‱ Pre-treatment: Never apply the sealer directly onto bare microcement. Always saturate the substrate first with two coats of TT Presealer or one coat of TT Pro-Plus.
‱ Rising Damp: We advise against microcement on substrates subject to rising damp. Basements must be properly drained, insulated, or completely dry.
‱ Working Temperature: Ambient room and substrate temperatures must remain between +10 °C and +25 °C throughout. The topcoat sealer must always cure naturally at ambient temperature without the use of fans.

1. Roller Selection and Preparation

Important: Roller Selection

Always use an 8 mm lint-free roller, preferably our Microstar roller. Alternative rollers often cause problems with coverage, durability, roller lines, or orange peel texture. In almost every project where finish issues occur, an unapproved roller was used.

Sealed Surface Requirement

The substrate must be saturated with an approved pre-treatment prior to topcoat application. Select TT Presealer for standard surfaces or Topsealer Pro-Plus for moisture-critical areas and metallic surfaces.

Intermediate Sanding

Lightly de-nib the pre-treated surface using 400 grit abrasive paper to ensure optimal mechanical bonding. Thoroughly wipe away all sanding dust with a dry microfiber cloth before applying sealer.

2. Mixing

🛑 Critical Mixing Precaution – Component B Spills:
It is critical to avoid spilling or splashing Component B onto floor or wall surfaces. The hardener will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.
Mixing Ratio

3 parts Component A to 1 part Component B by weight. Shake both bottles thoroughly approximately 20–30 minutes prior to mixing to allow any micro-bubbles to settle.

Preparation

Always pour Component A through a paint strainer into the bucket. Add Component B and stir slowly using a manual mixing stick. Let the mixture rest in the bucket for approx. 3 minutes before starting application so entrained air bubbles can escape.

Pot Life and Coverage

Pot life is approximately 45 minutes at +20 °C after mixing. Normal coverage is approx. 0.06 kg/mÂČ per coat. If consumption falls below this figure, applying an extra coat in the shower zone is recommended to ensure complete protection.

3. Application and Drying Times

🛑 Critical Application Rules – Direct Sunlight and Floor Protection:
‱ No Direct Sunlight: Never apply in direct sunlight, as excessive heat causes the sealer to dry too quickly, leading to roller lap lines. Mask windows or schedule application when direct sunlight is not hitting the surface.
‱ Protect Floors in Bathrooms: The floor must be masked off when sealing bathroom walls, particularly during the first coat. Drips and spills absorb instantly into unsealed microcement and leave permanent dark stains. Always place the roller tray on masking paper during floor sealing.
Cross-Rolling Technique

Cut in internal corners with a brush only directly ahead of the roller so the brushed margin does not set up prematurely. Divide the area into 1–2 mÂČ sections and work wet-on-wet to eliminate visible overlap lines:
1. Horizontal Pass: Roll the sealer side-to-side with steady, uniform pressure.
2. Vertical Cross-Pass: Immediately roll over the same section top-to-bottom, maintaining firm pressure.
3. Lay-off Pass: Tip off very lightly without downward pressure in a single, consistent direction to smooth out roller texture.
4. Maintain Wet Edge: Continue immediately from the leading wet edge so the fresh material blends seamlessly before it sets. Allowing the edge to dry too long will result in visible lap lines.

Number of Coats and Drying Time

Normally apply 2 fully covering coats to make the surface impermeable and water-resistant. Allow the first coat to dry for 18–36 hours. Always de-nib the surface lightly with 400 grit abrasive paper and wipe with a dry microfiber cloth before applying the second coat.

Documents and Technical Datasheets

đŸ›Ąïž Health & Safety Equipment & Tool Care:
‱ Protective Equipment: Wear nitrile gloves and safety glasses during handling and mixing. Ensure adequate room ventilation during sealing and curing.
‱ Tool Cleaning: Discard roller sleeves after use. Clean paint trays and tools immediately with water before the sealer dries, or with acetone/wipes if the sealer has set.