How to build up Forcrete on a worktop, from preparation to sealer.
Application: Worktops
Practical guide for build-up and application of Forcrete microcement on worktops.
âą Sample Board: Always prepare a test sample of at least 60Ă60 cm in the correct color and texture for client approval prior to starting.
âą Rigid Substrate: The worktop must be completely rigid and stable, with all joints flush and level. Movement in the carcass or substrate board will cause cracking over time.
âą Substrate Inspection: Address any substrate defects with the client prior to beginning work.
1. Surface Preparation & Reinforcement
2. System Selection
Standard specification for maximum impact resistance and surface hardness on worktops.
2. Base Coat 1: Sweep excess sand, fit reinforcement mesh, and trowel Microbase XT. Allow to dry.
3. Base Coat 2: Sand with 50-grit diamond pad, vacuum, and apply second coat of Microbase XT. Allow to dry.
4. Microquartz (Coat 1): Sand base coat smooth and trowel Microquartz Coarse. Allow to dry.
5. Microquartz (Coat 2): Sand lightly and apply final coat of Microquartz (Coarse, Medium, or Smooth).
Accelerated method enabling primer and both base coats to be applied during Day 1.
2. Drying: Force dry using fans (minimum 2 hours) until fully dry.
3. Base Coat 2: Sand lightly and trowel one coat of Microbase XT. Allow to dry.
4. Microquartz (Coat 1): Sand XT layer with 50-grit diamond pad and trowel Microquartz Coarse. Allow to dry.
5. Microquartz (Coat 2): Sand lightly and apply final coat of Microquartz (Coarse, Medium, or Smooth).
Apply material to the top horizontal surface first and allow to dry/cure until the following day. Sand the top surface, apply masking tape exactly along the top edge, and trowel the front vertical edge separately. This prevents spills and excess build-up onto the finished top surface.
3. Final Sanding & Sealing
Once the final coat of Microquartz has cured, sand the surface smooth, vacuum thoroughly, and wipe with a microfiber cloth prior to sealing.
đĄïž Recommended Sealer System for Worktops:
For maximum resistance against staining, heat, and daily abrasion on worktops, specify either Forshield FX + Forshield Ultra, or 2 coats of Forshield Ultra.
4. Workflow & Day-by-Day Schedule
âą Light Handling: The worktop can be handled with care after 24 hours.
âą Installation & Fixtures: Do not install hobs, sinks, or heavy appliances for at least 5 days.
âą Covering: Do not cover the worktop with protective paper or film during the first 14 days, as the sealer needs to breathe and reach full chemical cure.
âą Water & Cleaning: Do not expose the surface to standing water, washing-up liquid, or cleaning chemicals during the first 7 days.