Two-component epoxy microcement that gives a dense, hard-wearing top layer on floors, walls and in wet rooms, indoors and out.

tomas martinsson
Updated by tomas martinsson
Guide / Topcoat Systems

Forcrete — Microquartz

Comprehensive guide for preparation, application, sanding, and final finishing of Microquartz.

💡 About Microquartz:
Microquartz is a two-component, epoxy-based microcement applied with a steel trowel. The product acts as an impermeable, fully waterproof top layer with exceptional wear resistance and compressive strength for floors, walls, and wet areas both indoors and outdoors.
📱 Coverage & Mixing Ratio:
• Mixing Ratio (A : B): 916 : 84 (5.5 kg Component A to 500 g Component B).
• Material Consumption: Approx. 350–500 g/m² per coat (depending on grain size).
• Layer Thickness: Approx. 0.4–0.5 mm per coat.
Always use the mixing app to calculate material quantities, water, and pigment ratios for your specific project area.
⚠️ Important Information Before Starting:
• Working Temperature: Material, substrate, and ambient air temperatures must remain between +10 °C and +25 °C.
• Application Tools: Always spread the material with a flexible steel trowel. Use a plastic trowel for extended working time when compacting/burnishing the final finish.
• Build-up: Build up the base layer according to substrate type and application area. Optimal results are achieved by applying Coarse as the first coat, followed by a final coat of Coarse, Medium, or Smooth depending on desired texture.
• Storage: Store frost-free. Shelf life is 12 months from production date in unopened original packaging.
• Pot Life / Open Time: Approximately 40–60 minutes after incorporating the hardener (Component B).

1. Base Coat & Substrate Build-up

Before applying Microquartz, the substrate must be prepared with an approved base coat system. Select the relevant application instructions below:

2. Substrate Preparation

1.
Substrate Inspection: Ensure the base coat is fully cured, clean, dry, and free of dirt, oil, and grease.
2.
Sand the Base Coat: Sand the base coat flush using a 40 or 50 grit diamond pad to eliminate all ridges and imperfections. Sweep up excess aggregate and vacuum the surface thoroughly.

3. Mixing & Pigmentation

🧪 Mixing Microquartz:
Mix Microquartz at a ratio of 916 : 84 (1 bottle of 500 g Component B to 1 bucket of 5.5 kg Component A). Always calculate exact water and pigment ratios in the app. Refer to the dedicated guide for full instructions:
🛑 Critical Mixing Precaution – Component B Spills:
It is critical to avoid spilling or splashing unmixed Component B onto floor or wall surfaces. It will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.

4. Applying Microquartz

Coat 1: Microquartz Coarse (Standard across all systems)
• Application: Trowel the material out evenly and tightly using a flexible steel trowel in grain thickness (approx. 0.5 mm, consumption approx. 450–500 g/m²).
• Compacting / Burnishing: Normally not required on Coat 1, unless the substrate requires extra opacity or if the finish coat will be applied in Medium/Smooth.
• Curing & Sanding: Allow to cure for 24 hours until the next day. Sand the surface smooth using a 40 or 50 grit diamond pad and vacuum thoroughly.
Coat 2: Select Finish for Final Coat
Option A: Coarse Most Popular

The most textured and classic Forcrete stone appearance.

• Application: Spread the material (approx. 0.5 mm) with a flexible steel trowel. Then compact the surface in circular, irregular movements to achieve the desired texture.
• Compacting Tools:
– Plastic Trowel: Produces a homogeneous, uniform finish without metallic burnishing marks.
– Steel Trowel: Enhances movement, depth, and color variation.
• Light Colors: Compacting light colors with a steel trowel can leave dark burnish marks. Always use a plastic tool when finishing light shades.
• Consumption: Approx. 450–500 g/m².
Option B: Medium & Smooth Smooth & Uniform

Smooth stone texture (Medium) or velvety finish with subtle shading (Smooth).

• Application: Spread the material with a flexible steel trowel over approx. 1 m² sections, working in open patterns. Vary trowel directions to avoid repetitive lines.
• Important: Never leave a straight or heavy wet edge; the material sets rapidly at the boundary and will create visible overlap marks.
• Smooth: Apply very tightly at an angle of approx. 45°. Trowel off with a light touch.
• Consumption: Medium approx. 400–450 g/m² / Smooth approx. 350–400 g/m².
💡 Pro Tip for Crisp Internal & External Corners (Final Coat):
To produce clean, crisp corners easily, mask the 2 adjoining walls at the junction prior to applying the final coat on your working wall. Repeat the procedure on opposing walls.
• Remove masking tape immediately once the active wall is troweled.
• Direct a fan toward the finished walls to optimize air circulation and drying.
• Sand and re-tape: Wait until the following day to sand finished corner returns before re-masking and applying to adjoining walls. With continuous fan assistance, tape can often be applied later the same day, but surfaces must not be sanded prematurely.
This technique applies to both internal and external corners. While optional, it significantly streamlines achieving sharp detailing.

5. Final Sanding & Sealing

Once the final coat of Microquartz has cured, sand the surface with a finer grit, vacuum thoroughly, and seal with a topcoat:

Day-by-Day Schedule

Day
Process
Day 1
Roll primer (Forprime DPM + broadcast sand to saturation).
Day 2
Apply Base Coat 1 (Forprime HB/FL with sand or Microbase XT).
Day 3
Intermediate sanding and apply Base Coat 2 (Forprime HB/FL or Microbase XT).
Day 4
Sand Base Coat 2 and apply Microquartz Coarse (Coat 1).
Day 5
Intermediate sand Coat 1 and apply Microquartz Coarse / Medium / Smooth (Finish Coat).
Day 6
Final sanding, thorough vacuuming, and topcoat sealing (2–3 coats of sealer).
🛑 Health & Safety Equipment:
• Product contains epoxy resin and may cause skin irritation or allergic reactions.
• Always wear chemical-resistant nitrile gloves during all handling, mixing, and troweling.
• Use safety goggles during mechanical paddle mixing.
• Wear a suitable dust mask/respirator during all sanding procedures.
• Ensure continuous, adequate workspace ventilation and keep out of reach of children.
⏱️ Curing Times & Loading:
• Foot Traffic / Light Load: After 24 hours.
• Furniture & Full Mechanical Load: Earliest after 5 days.
• Water & Cleaning Agents: Earliest after 7 days.
• Rugs & Protective Coverings: Earliest after 14 days.

Documents & Technical Datasheets