Epoxy base coats for floors and tiles that embed the mesh and give a hard, rigid base. Mixing, application and sand broadcasting.

tomas martinsson
Updated by tomas martinsson
Guide / Base Coat

Forcrete — Forprime HB & FL

Comprehensive guide for application, mixing, installation, and quartz sand broadcasting of Forprime HB and FL epoxy base coats.

💡 About Forprime HB & FL:
Forprime HB and FL are 2-component epoxy-based base coats designed for floors and tiled substrates. They are used to embed reinforcement mesh, providing an ultra-hard, rigid, and completely impermeable foundation. HB has a higher viscosity and bridges deeper grout joints slightly better than FL, whereas FL offers exceptional workability and flows more easily. The wet layer is always broadcast to full saturation with quartz sand to ensure optimal mechanical keying and adhesion for subsequent coats.
📱 Coverage & Specifications:
• Coat 1 (Forprime HB / FL): Approx. 1.5–1.75 kg/m².
• Coat 2 (Forprime HB / FL): Approx. 0.7–1.0 kg/m².
• Quartz Sand: Approx. 2.5–4 kg/m² per coat. Broadcast quartz sand generously into the wet epoxy until complete saturation is achieved. Once fully cured, sweep up and reclaim excess unbonded sand for reuse.
⚠️ Important Information Before Starting:
• Working Temperature: Material, substrate, and ambient air temperatures must remain between +10 °C and +25 °C.
• Substrate: The substrate must always be primed with Forprime DPM or Forprime EPST prior to applying HB/FL.
• Sand Broadcasting: Broadcast quartz sand directly into the wet epoxy immediately to ensure full aggregate saturation.
• Pot Life: Approximately 20 minutes. Pour the mixed material immediately onto the floor in ribbons to prevent exothermic buildup in the bucket.

1. Primer & Substrate

The substrate must always be primed prior to applying Forprime HB or FL. Select the appropriate primer guide for your substrate:

2. Substrate Preparation

1.
Verify Primer: Ensure Forprime DPM or EPST is fully cured. The surface must be dry and free of contamination.
2.
Install Reinforcement Mesh (When Specified): Roll out 160 g fiberglass mesh across the floor and secure it with a hot-melt glue gun. Always butt-joint the sheets edge-to-edge without overlapping to avoid creating ridges.

3. Mixing

🛑 Critical Mixing Precaution – Component B Spills:
It is critical to avoid spilling or splashing unmixed Component B onto floor or wall surfaces. It will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.
🧪 Mixing Instructions & Dual-Pot Protocol:
• Pour the entire contents of Component B into the bucket containing Component A.
• Paddle mix at low speed for at least 2–3 minutes until completely smooth.
• Best Practice – Dual-Pot Mixing: After the initial mix, transfer the material into a clean second bucket, scraping down the walls and bottom of the first container. Mix briefly once more. This prevents unmixed resin from the bottom and sides from being applied onto the floor. Any unmixed resin reaching the substrate will never cure, leading to localized soft spots and eventual reflective cracking. If dual-pot mixing is omitted, you must scrape the container walls and bottom meticulously and mix thoroughly.

4. Application & Sand Broadcasting

Coat 1: Forprime HB/FL Over Mesh + Sand Broadcast
• Application: Pour the mixed epoxy onto the floor and spread it evenly across the mesh using a flat trowel or steel blade (consumption approx. 1.5–1.75 kg/m²). Do not use a notched trowel.
• Sand Broadcasting: Broadcast quartz sand generously (approx. 2.5–4 kg/m²) directly into the wet resin until the surface is completely covered and no wet resin is exposed.
• Curing: Allow to cure for 24 hours (minimum 18 hours).
• Intermediate Grinding: Sweep up and reclaim excess sand. Vacuum clean, then diamond-grind the surface smooth. Vacuum the surface meticulously once again—residual loose sand will cause Coat 2 to set up significantly faster.
Coat 2: Forprime HB/FL (Second Base Coat) + Sand Broadcast
• Purpose: Conceal the mesh pattern and eliminate any remaining substrate imperfections. When installing systems without mesh, pigmented Microbase XT is frequently applied instead.
• Application: Apply a fully covering second coat of Forprime HB/FL using a flat trowel (consumption approx. 0.7–1.0 kg/m²) and immediately broadcast quartz sand (approx. 2.5–4 kg/m²) to saturation.
• Curing & Sanding: Allow to cure for 24 hours (minimum 18 hours). Sweep and reclaim excess sand. Sand the surface using 40 grit sandpaper or a 50 diamond pad and vacuum thoroughly before applying the first coat of Microquartz Coarse.

5. Sanding & Next Steps

Once the base coat is sanded and vacuumed thoroughly, proceed with Microquartz application:

🛑 Health & Safety Equipment:
• Product contains epoxy resin and may cause skin irritation upon contact.
• Always wear chemical-resistant nitrile gloves during mixing and troweling.
• Wear safety glasses/goggles during paddle mixing.
• Wear an approved particulate respirator during all sanding operations.
• Ensure continuous, adequate workspace ventilation and keep out of reach of children.
⏱️ Curing & Tool Maintenance:
• Curing Time: 24 hours (minimum 18 hours) before sweeping sand and sanding.
• Tool Cleaning: Clean tools with acetone or solvent wipes immediately after use before the epoxy cures.