FC - Mixing and Pigmentation (ENG)

How to pigment and mix Microquartz, Microbase XT and Monostone. Always pigment a full bucket of component A at a time.

tomas martinsson
Updated by tomas martinsson
Guide / Technical Support

Mixing Instructions & Pigmentation

Instructions for pigmentation and mixing of Microquartz, Microbase XT, and Monostone.

⚠️ Important regarding pigmentation:

Always pigment a full bucket of Component A at a time to ensure accurate color. Pigmenting the entire bucket does not mean all material must be applied immediately – measure out smaller batches as needed. Pigmenting smaller individual batches can lead to color variations between mixes (best reserved for the initial base coat).

Pigmentation for the 2-component products (Microquartz and Microbase XT) must be carried out at least 2 hours before application, but is ideally done the day before. Once Component A is pigmented, it can be stored for months prior to adding the hardener.

Step 1: Pigmenting Component A (Microquartz & Microbase XT)

1.
Weigh out: Weigh out the specified amount of pigment powder into a clean container according to the mixing app specifications to ensure correct proportions.
2.
Dissolve pigment: Dilute the pigment powder with clean water in the container according to the following guidelines:
  • "1" shade (Microquartz): Approx. 100 g water (e.g. Feather 1).
  • "2" shade (Microquartz): Approx. 150–200 g water (e.g. Feather 2, start around 150 g).
  • "3" shade (Microquartz): Requires more water due to high pigment load. Add what is necessary to dissolve powder completely.
  • Microbase XT: Add approx. 1.5 times more water than for Microquartz (approx. 150–300 g water).
3.
Pour in: Stir or shake until pigment is completely dissolved. Then pour the liquid directly into Component A.
4.
Rinse container: Add a small amount of extra water to rinse the container and transfer all residual pigment into the bucket.
5.
Document: Write the mixed color shade and total amount of water added directly on the bucket. Use the exact same water amount across all buckets in the project.
6.
Mix: Blend Component A using a paddle mixer until smooth and uniform in color. Scrape the sides and bottom thoroughly and mix again.
7.
Rest: Allow the material to rest for at least 2 hours (preferably overnight) so the pigment settles completely.
💡 Tip for Microbase XT and Microquartz Coarse:
Both Microbase XT and Microquartz Coarse carry very low risk when pigmented directly in the bucket. Pour water and pigment powder straight into Component A and mix thoroughly. Let the mixture rest for at least 2 hours before adding hardener. The coarser aggregates in these products significantly reduce the risk of pigment streaks.

Step 2: Adding Hardener (Component B)

1.
Mixing ratio (A : B): Once the material has rested for at least 2 hours and you are ready to trowel, add the hardener (Component B):
• Microquartz: Mixed 916 : 84 (one 500 g bottle of Comp B to one 5.5 kg bucket of Comp A).
• Microbase XT: Mixed 92 : 8 (800 g Comp B to one 9.2 kg bucket of Comp A).
2.
Mix thoroughly: Blend with a paddle mixer for approx. 3 minutes. Scrape sides and bottom well to ensure no unmixed Component A remains.

Step 3: Final Water Volume Prior to Application

Once the hardener has been added and mixed in, add the remaining water to achieve your desired working consistency.

🛑 Golden rule for water quantity:

You can always add more water, but you can never remove it. Start with a lower amount and increase gradually if needed. To ensure a uniform color across the entire area, use the exact same total water quantity in all buckets for the final coat.

Indicative Water Quantities (Microquartz & Microbase XT)

Stated in grams of water per 1 kg of finished material (including water added during Step 1 pigmentation). Use the app for precise batch numbers:

Product Type Water per kg Percentage (%) Characteristics
Microbase XT 20–80 g 2–8 % Base coat. Adapt water ratio to temperature and substrate.
Microquartz Smooth & Medium 20–40 g 2–4 % Lower water ratio provides maximum hiding power / coverage.
Microquartz Coarse 30–90 g 4–9 % Normally 5–6% on walls/smaller floors, 7–9% on larger floor areas.
3.
Final mixing: Mix material for approx. 3 minutes after adding the last water. The mixture is then ready for application.

Pigmentation of Monostone (XL & L)

Monostone is a 1-component cement that does not require the resting period that Microquartz does. It can be pigmented right before starting or well in advance:

• Water amount: Add 50–200 g clean water to the pigment.
• Minimizing streak risk: Dissolve the pigment in water in a separate container before pouring it into the bucket to eliminate pigment specks and streaks.
• Mixing: Mix thoroughly with a paddle mixer until all pigment is evenly dispersed throughout the cement.

4. Next Steps