FC - Microgranite / Microstone (ENG)
Decorative floors where you broadcast flakes into wet pigmented Microquartz Medium, for a terrazzo or granite look.
Forcrete — Microstone & Microgranite
Comprehensive guide for preparation, troweling, rolling, and flake broadcasting for Microgranite and Microstone.
Microstone and Microgranite are popular decorative floor systems created by applying pigmented Microquartz Medium and subsequently saturating the wet surface with decorative flakes. This technique yields an impermeable, fully waterproof finish with exceptional wear resistance and a classic terrazzo or granite aesthetic.
- Microgranite: Formulated using fine flakes exclusively (colors 01–18). Creates a uniform, dense granite texture.
- Microstone: Created using a combination of large flakes (colors A–K) and small flakes (01–18). Adds pronounced depth and movement to the terrazzo pattern.
• Cement: Microquartz Medium, pigmented in the desired shade.
• Mixing Ratio (A : B): 916 : 84 (5.5 kg Component A to 500 g Component B).
• Material Consumption Microquartz Medium: Approx. 450–500 g/m².
• Small Flakes (colors 01–18): Approx. 300 g/m² for standard full coverage (for partial scatter, coverage depends on desired density).
• Large Flakes (colors A–K, Microstone only): Volume adjusted to desired pattern density and aesthetic.
Always use the mixing app to calculate material volumes, water ratios, and pigments precisely for your project.
• Working Temperature: Material, substrate, and ambient air temperatures must remain between +10 °C and +25 °C.
• Base Coat Requirement: Flakes are installed exclusively over base coats of Forprime HB or FL (Microbase XT must not be used with flakes). It is critical that the base coat has been broadcast to saturation with quartz sand 0.3–0.6 mm or 0.4–0.8 mm to ensure proper grip and mechanical bonding.
• Crew Sizing & Roles: Flake installations generally require more applicators than standard Microquartz—particularly Microstone due to its multi-step sequence. On larger areas, dedicate one installer to troweling while another wears spiked shoes to roll and broadcast flakes.
• Spiked Shoes: Ensure spikes are completely clean and sharp. Dirty or blunt spikes will drag flakes through the resin and create permanent blemishes.
• Pot Life / Open Time: Approximately 40–60 minutes after incorporating Component B.
1. Base Coat
The foundation is constructed using an approved base coat system (Forprime HB or FL). Refer to the guide below for detailed build-up and sand broadcasting instructions:
2. Substrate Preparation
3. Mixing & Pigmentation
• Mix pigmented Microquartz Medium in the ratio 916 : 84 (1 bottle of 500 g Component B to 1 bucket of 5.5 kg Component A). Use the mixing app to calculate exact pigment and water ratios.
• Critical Mixing Precaution: It is critical to avoid spilling or splashing unmixed Component B onto floor or wall surfaces. It will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.
Follow the dedicated mixing guide for complete instructions:
4. Application & Flake Broadcasting
• Angle & Coverage: Apply Microquartz Medium using a flexible steel trowel at an angle of approx. 45 degrees. Trowel thinly, passing over multiple times if needed to achieve full opacity and close all substrate pores.
• Rolling with Textured Spackle Roller: Immediately roll over the freshly troweled section using a heavy textured roller (the coarse variety with a steel-wool-like open loop structure). This step opens the paste and creates an ideal mechanical bed for the flakes.
• Critical Transition Margin: Never broadcast flakes all the way to the leading wet edge. Always maintain a clean, un-flaked boundary zone to facilitate seamless wet-on-wet blending with the subsequent section without dry lines or overlap marks.
Classic and homogeneous granite appearance with fine color flakes.
• Coverage Density:
– Full Coverage (Standard): Increase volume progressively until the surface is completely saturated (no exposed microcement, consumption approx. 300 g/m²).
– Partial Scatter: Broadcast a lighter density to achieve the desired exposure.
• Workflow: Move onto the next section and tie the sections together wet-on-wet.
Dynamic terrazzo aesthetic combining large and small accent flakes.
• 2. Roll Over the Surface: Once large flakes are positioned, roll over the section with the textured roller to press flakes firmly into the microcement. NOTE: Do not draw microcement over the flakes (only minimal paste contact is acceptable)—slurry over flakes indicates the layer was applied too heavily.
• 3. Cast Small Flakes: Cast the fine flakes (01–18) upward until full saturation is achieved (or to your desired pattern density). Tossing upward remains essential to prevent clustering and uneven absorption.
• Workflow: Continue to the next section, blending the transitions wet-on-wet.
5. Final Sanding & Sealing
Once cured overnight, sand away loose excess flakes, flatten the surface to the desired profile, vacuum meticulously, and seal with a protective topcoat (2–3 coats). Select your preferred sealing system below:
Day-by-Day Schedule
• Always wear chemical-resistant nitrile gloves throughout handling and application.
• Wear safety glasses/goggles during paddle mixing and flake broadcasting.
• Wear an approved particulate respirator during all sanding operations.
• Ensure continuous, adequate workspace ventilation and keep out of reach of children.
• Foot Traffic / Light Load: After 24 hours.
• Furniture & Full Mechanical Load: Earliest after 5 days.
• Water & Cleaning Agents: Earliest after 7 days.
• Rugs & Protective Coverings: Earliest after 14 days.