FC - Trowel X Base & L (ENG)
Machine-troweled microcement, for example with a Rokamat, for a hard, smooth surface with an industrial concrete look.
Updated
by tomas martinsson
Guide / Flooring Systems
Forcrete — Trowel X (Base & L)
Comprehensive guide for preparation, pigmentation, mechanical trowel application, and final sealing of Trowel X Base and Trowel X L.
💡 About Trowel X:
Trowel X is a power-troweled microcement system designed to create an ultra-hard, smooth surface with a dynamic, industrial concrete aesthetic. The system is mechanically finished using a specialized power trowel / finishing machine (e.g., Rokamat) to compact the paste, close the aggregate surface, and develop the authentic industrial finish.
Trowel X is a power-troweled microcement system designed to create an ultra-hard, smooth surface with a dynamic, industrial concrete aesthetic. The system is mechanically finished using a specialized power trowel / finishing machine (e.g., Rokamat) to compact the paste, close the aggregate surface, and develop the authentic industrial finish.
📱 Coverage & Mixing Ratio:
• Mixing Ratio (A : B): 92 : 8 (92 parts Component A to 8 parts Component B).
• Trowel X Base: Approx. 600–700 g/m² (troweled fully opaque in grain thickness).
• Trowel X L: Approx. 566–600 g/m² (applied very thin in irregular patches/islands).
Always use the mixing app to calculate material volumes, water ratios, and pigments precisely for your project area.
• Mixing Ratio (A : B): 92 : 8 (92 parts Component A to 8 parts Component B).
• Trowel X Base: Approx. 600–700 g/m² (troweled fully opaque in grain thickness).
• Trowel X L: Approx. 566–600 g/m² (applied very thin in irregular patches/islands).
Always use the mixing app to calculate material volumes, water ratios, and pigments precisely for your project area.
⚠️ Important Information Before Starting:
• Working Temperature: Material, substrate, and ambient air temperatures must remain between +10 °C and +25 °C.
• Pre-Pigmentation: Pigment Component A at least 2 hours prior to application.
• Hardener: Never add hardener in advance. The hardener is added only after the pre-pigmented base has rested for at least 2 hours.
• Pot Life / Open Time: Approximately 40–60 minutes after incorporating the hardener (Component B).
• Working Temperature: Material, substrate, and ambient air temperatures must remain between +10 °C and +25 °C.
• Pre-Pigmentation: Pigment Component A at least 2 hours prior to application.
• Hardener: Never add hardener in advance. The hardener is added only after the pre-pigmented base has rested for at least 2 hours.
• Pot Life / Open Time: Approximately 40–60 minutes after incorporating the hardener (Component B).
1. Base Coat & Substrate Build-up
Prior to applying Trowel X, the substrate must be built up with an approved base coat system. Select the corresponding guide below for your chosen build-up:
🗂️ Alternative Build-up for Large, Level Floor Areas:
For commercial environments where project turnaround and budget are prioritized, and minor hairline movement can be accommodated (e.g., retail spaces or offices on level concrete/screed):
Process: Diamond grind substrate → Forprime DPM + sand → Trowel X Base → Trowel X L → Final Sealer.
For commercial environments where project turnaround and budget are prioritized, and minor hairline movement can be accommodated (e.g., retail spaces or offices on level concrete/screed):
Process: Diamond grind substrate → Forprime DPM + sand → Trowel X Base → Trowel X L → Final Sealer.
2. Mixing & Pigmentation
🛑 Critical Mixing Precaution – Component B Spills:
It is critical to avoid spilling or splashing unmixed Component B onto floor or wall surfaces. It will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.
It is critical to avoid spilling or splashing unmixed Component B onto floor or wall surfaces. It will not cure independently, and microcement applied over contaminated areas will fail to cure properly. Always mix on protective floor covering or in a separate prep area.
🧪 Mixing Instructions:
• Pre-Pigmentation (At least 2 hours prior): Dissolve the pigment powder in a portion of the water as indicated in the app. Pour the solution into Component A and mix using a mechanical paddle mixer until uniform. Note the added water volume and color code on the lid, then let rest for at least 2 hours.
• Add Hardener (Component B): Shake the Component B bottle thoroughly. Add the entire bottle into the bucket and paddle mix for at least 3 minutes. Scrape sides and bottom thoroughly.
• Add Remaining Water: Add the remaining designated water volume only after the hardener is fully incorporated, then mix thoroughly once more. Never add excess water before the hardener, as this can cause improper curing and color shading.
• Pre-Pigmentation (At least 2 hours prior): Dissolve the pigment powder in a portion of the water as indicated in the app. Pour the solution into Component A and mix using a mechanical paddle mixer until uniform. Note the added water volume and color code on the lid, then let rest for at least 2 hours.
• Add Hardener (Component B): Shake the Component B bottle thoroughly. Add the entire bottle into the bucket and paddle mix for at least 3 minutes. Scrape sides and bottom thoroughly.
• Add Remaining Water: Add the remaining designated water volume only after the hardener is fully incorporated, then mix thoroughly once more. Never add excess water before the hardener, as this can cause improper curing and color shading.
3. Application
Step 1: Trowel X Base (Texture Coat 1)
• Preparation: Verify that the base coat is fully cured. Sand the surface smooth using a 40 or 50 grit diamond pad (on Microbase XT) or a concrete diamond grinder / 50 diamond pad (on Forprime HB). Sweep away excess sand and vacuum thoroughly.
• Water Volume: Total approx. 500 g water per 9.2 kg bucket (including pigment water).
• Troweling: Trowel Trowel X Base fully opaque using a flexible steel trowel at an angle of approx. 45 degrees (coverage approx. 600–700 g/m²). The thickness must equal the aggregate size (approx. 0.4–0.5 mm) with a distinct scraping sound against the substrate. Allow to cure until the next day.
• Water Volume: Total approx. 500 g water per 9.2 kg bucket (including pigment water).
• Troweling: Trowel Trowel X Base fully opaque using a flexible steel trowel at an angle of approx. 45 degrees (coverage approx. 600–700 g/m²). The thickness must equal the aggregate size (approx. 0.4–0.5 mm) with a distinct scraping sound against the substrate. Allow to cure until the next day.
Step 2: Trowel X L (Finish Coat with Power Trowel)
• Preparation: Sand down Trowel X Base using a 50 diamond pad or 100 resin pad. Detail corners and perimeter edges with an edge sander or by hand. Vacuum thoroughly and mask wall skirtings/bases against splatter.
• Water Volume: Total 200–220 g (max 250 g) water per 4.6 kg bucket. Excessive water will cause blotches and tiger-striping.
• Troweling & Machine Finishing: Trowel Trowel X L very thin in small, irregular islands across the floor (approx. 566–600 g/m²). Immediately run the power trowel (Rokamat) across the wet area to compress the aggregates and draw out the industrial finish. Allow to cure until the following day.
• Water Volume: Total 200–220 g (max 250 g) water per 4.6 kg bucket. Excessive water will cause blotches and tiger-striping.
• Troweling & Machine Finishing: Trowel Trowel X L very thin in small, irregular islands across the floor (approx. 566–600 g/m²). Immediately run the power trowel (Rokamat) across the wet area to compress the aggregates and draw out the industrial finish. Allow to cure until the following day.
4. Final Sanding & Sealing
Once Trowel X L has cured, sand the surface with 50 and/or 100 grit diamond pads, vacuum thoroughly, and seal with a topcoat:
Day-by-Day Schedule
Standard (With Base Layer):
Alternative: Directly on Level Substrate:
💡 Pro Tip: Forprime DPM and Trowel X Base can be applied on the same day with a 6-hour interval. This reduces the alternative method to just 3 working days.
🛑 Health & Safety Equipment:
• Wear nitrile protective gloves during mixing and application.
• Wear eye protection/safety goggles during paddle mixing and power trowel operation.
• Wear an approved respirator mask during all sanding stages.
• Ensure continuous, adequate workspace ventilation and keep out of reach of children.
• Wear eye protection/safety goggles during paddle mixing and power trowel operation.
• Wear an approved respirator mask during all sanding stages.
• Ensure continuous, adequate workspace ventilation and keep out of reach of children.
⏱️ Curing Times & Loading:
• Foot Traffic / Light Load: After 24 hours.
• Furniture & Full Mechanical Load: Earliest after 5 days.
• Water & Cleaning Agents: Earliest after 7 days.
• Rugs & Protective Coverings: Earliest after 14 days.
• Foot Traffic / Light Load: After 24 hours.
• Furniture & Full Mechanical Load: Earliest after 5 days.
• Water & Cleaning Agents: Earliest after 7 days.
• Rugs & Protective Coverings: Earliest after 14 days.
Documents & Technical Datasheets
📄 Technical Documentation: Forcrete Trowel X
- Technical Datasheet Trowel X Base (TDS) (PDF) ↗
- Technical Datasheet Trowel X L (TDS) (PDF) ↗
- Safety Datasheet (SDS): Coming soon, contact Designcement to receive it.
How did we do?
FC - Monostone XL / L (Rockplaster) (ENG)