TT - Microbase / Natture L (ENG)
Topciment base coat under Microdeck or Microfino. Preparation, reinforcement, mixing and application on walls and floors.
Updated
by tomas martinsson
Guide / Base Coat
Topciment — Microbase & Natture L
Instructions for preparation, reinforcement, mixing, and application on walls and floors to build a solid and level foundation.
🛑 Before You Begin:
• Substrate condition & cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
• Substrate must be completely level: Microcement is applied in very thin coats and will not level out depressions or height discrepancies.
• Working temperature: Room and substrate temperatures must remain between +10 °C and +25 °C throughout.
• Reinforcement mesh: Fiberglass mesh must always be installed before troweling the first base coat.
• Movement joints: Never bridge expansion, control, or structural joints in the substrate; honor them through the finish.
• Substrate condition & cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
• Substrate must be completely level: Microcement is applied in very thin coats and will not level out depressions or height discrepancies.
• Working temperature: Room and substrate temperatures must remain between +10 °C and +25 °C throughout.
• Reinforcement mesh: Fiberglass mesh must always be installed before troweling the first base coat.
• Movement joints: Never bridge expansion, control, or structural joints in the substrate; honor them through the finish.
1. About the Base Coats
2. Coverage & Preparation
Instructions: Mixing App ↗
Instructions: Primer Selection Guide ↗
Instructions: Fiberglass Mesh Guide ↗
3. Mixing
4. System Build-up & Technique
5. Application: Walls vs. Floors
Wall Application
• Starting point: Begin in an upper corner. Work the margins out approx. 30–40 cm along the ceiling junction and 1 meter downwards.
• Spreading: Deposit paste along the lower boundary of the freshly applied section. Trowel out at a 45° angle until the scraping sound is heard.
• Break the pattern: Trowel back over the wet section with multidirectional passes. Regularly wipe the top blade of your trowel clean to prevent dry paste debris from scoring the finish.
• Spreading: Deposit paste along the lower boundary of the freshly applied section. Trowel out at a 45° angle until the scraping sound is heard.
• Break the pattern: Trowel back over the wet section with multidirectional passes. Regularly wipe the top blade of your trowel clean to prevent dry paste debris from scoring the finish.
Floor Application
• Starting point: Start at the point furthest from the exit, detailing floor drains and wall junctions first.
• Large areas: Pour a bead of paste along the boundary and spread with broad, sweeping passes. Always maintain a wet edge, working away from the finished areas.
• Break the pattern: Work with smaller, multidirectional passes as far as you can reach comfortably without stepping onto the wet microcement.
• Large areas: Pour a bead of paste along the boundary and spread with broad, sweeping passes. Always maintain a wet edge, working away from the finished areas.
• Break the pattern: Work with smaller, multidirectional passes as far as you can reach comfortably without stepping onto the wet microcement.
6. Next Steps: Finish Coats & Sanding
Allow base coat 2 to dry completely. Sand the surface smooth using a random orbital sander and 40 grit silicon carbide abrasive before proceeding to your selected finish:
Documents & Technical Datasheets
📄 Technical Documentation: Standard Microbase
📄 Technical Documentation: Natture L
🛡️ Health & Safety Equipment & Tool Care:
• Protective Equipment: Products contain cement and lime which can irritate skin and eyes. Wear protective gloves and safety goggles. Always wear respiratory protection (P2/P3) when handling dry powder and during all sanding stages. Ensure good ventilation throughout the workspace.
• Tool Cleaning: Clean tools thoroughly with water immediately after use before material starts curing. For hardened deposits, clean using acetone or cleaning wipes.
• Protective Equipment: Products contain cement and lime which can irritate skin and eyes. Wear protective gloves and safety goggles. Always wear respiratory protection (P2/P3) when handling dry powder and during all sanding stages. Ensure good ventilation throughout the workspace.
• Tool Cleaning: Clean tools thoroughly with water immediately after use before material starts curing. For hardened deposits, clean using acetone or cleaning wipes.