Skip to main content

TT - Microbase / Natture L (ENG)

Topciment base coat under Microdeck or Microfino. Preparation, reinforcement, mixing and application on walls and floors.

tomas martinsson
Updated by tomas martinsson
Guide / Base Coat

Topciment — Microbase & Natture L

Instructions for preparation, reinforcement, mixing, and application on walls and floors to build a solid and level foundation.

🛑 Before You Begin:
• Substrate condition & cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
• Substrate must be completely level: Microcement is applied in very thin coats and will not level out depressions or height discrepancies.
• Working temperature: Room and substrate temperatures must remain between +10 °C and +25 °C throughout.
• Reinforcement mesh: Fiberglass mesh must always be installed before troweling the first base coat.
• Movement joints: Never bridge expansion, control, or structural joints in the substrate; honor them through the finish.

1. About the Base Coats

Function & Systems

Applies to Standard Microbase (L, XL) as well as Natture (L, XL). Two-component microcement serving as the load-bearing foundation that embeds the reinforcement mesh before the finish coats (e.g., Microdeck or Microfino) are applied.

Tool Selection

All our steel trowels can be used. A stiffer steel trowel is recommended to prevent excessive coat thickness and to maintain consistent application pressure.

2. Coverage & Preparation

Standard Microbase

Mixed with 10 kg powder to 2.5–3.0 liters of Acricem Resin. Consumption: approx. 2.0–3.0 kg/m² total across 2 coats (including mesh embedment). Max 1.0 mm per coat.

Natture L / XL

Mixed with 10 kg powder to 3.25–3.5 liters of Acricem Resin. Consumption: approx. 2.0–3.0 kg/m² total across 2 coats. Max 1.0 mm per coat.

Primer & Reinforcement

The substrate must always be primed and fiberglass mesh installed before troweling the first base coat. Use the mixing app to calculate accurate proportions and material quantities.

3. Mixing

Mixing Sequence

1. Measure and weigh the designated volume of Acricem Resin into a clean bucket.
2. Add the pigment dose and stir thoroughly until the liquid reaches a uniform color.
3. Gradually introduce the microcement powder while mixing continuously. Paddle mix at low speed for at least 4 minutes until the paste is completely smooth and lump-free.

Pot Life in Bucket

Topciment microcements have a pot life of approximately 2–3 hours in the bucket depending on ambient room temperature and relative humidity. Do not batch more material than can be applied comfortably within this window.

4. System Build-up & Technique

Technique: Spread the Material — Break the Pattern

Avoid reworking the same section more than necessary. Apply strictly in grain thickness (max 1 mm). Hold the trowel at approximately a 45-degree angle with light pressure and listen attentively for the scraping sound against the substrate. If you do not hear a crisp scraping sound, the layer is being applied too thick.

Coat 1: Embedding the Mesh

Pigmenting the first base coat is recommended. Secure the mesh using Primacem Plus and embed it with the base coat. The goal of Coat 1 is to achieve a flat surface and fully conceal the mesh profile—breaking the pattern is not required on this pass.

Dry Sponging & Intermediate Sanding

To minimize sanding, trowel ridges can be smoothed out with a completely dry sponge as soon as the surface is tack-free and no longer sticks to your gloves (never use water on the sponge). Once dry, sand any remaining imperfections using 40 grit silicon carbide. Sand away any mesh bubbles or ridges. Vacuum meticulously.

Coat 2: Break the Pattern

Always pigment the second base coat. On Coat 2, it is essential to break the trowel pattern using multidirectional, irregular passes, as this texture will telegraph through to the final finish. Leave as few trowel ridges as possible.

5. Application: Walls vs. Floors

Wall Application
• Starting point: Begin in an upper corner. Work the margins out approx. 30–40 cm along the ceiling junction and 1 meter downwards.
• Spreading: Deposit paste along the lower boundary of the freshly applied section. Trowel out at a 45° angle until the scraping sound is heard.
• Break the pattern: Trowel back over the wet section with multidirectional passes. Regularly wipe the top blade of your trowel clean to prevent dry paste debris from scoring the finish.
Floor Application
• Starting point: Start at the point furthest from the exit, detailing floor drains and wall junctions first.
• Large areas: Pour a bead of paste along the boundary and spread with broad, sweeping passes. Always maintain a wet edge, working away from the finished areas.
• Break the pattern: Work with smaller, multidirectional passes as far as you can reach comfortably without stepping onto the wet microcement.

6. Next Steps: Finish Coats & Sanding

Allow base coat 2 to dry completely. Sand the surface smooth using a random orbital sander and 40 grit silicon carbide abrasive before proceeding to your selected finish:

Documents & Technical Datasheets

📄 Technical Documentation: Standard Microbase
🛡️ Health & Safety Equipment & Tool Care:
• Protective Equipment: Products contain cement and lime which can irritate skin and eyes. Wear protective gloves and safety goggles. Always wear respiratory protection (P2/P3) when handling dry powder and during all sanding stages. Ensure good ventilation throughout the workspace.
• Tool Cleaning: Clean tools thoroughly with water immediately after use before material starts curing. For hardened deposits, clean using acetone or cleaning wipes.

How did we do?

TT - Acricem Resin (ENG)

TT - Microdeck / Natture M (ENG)