🛑 Before You Begin:
• Substrate & Cleanliness: Ensure the surface is sound, dry, and free of dirt, oil, and grease.
• Substrate Must Be Level: Microcement is applied in very thin coats and will not conceal underlying depressions, hollows, or height discrepancies.
• Working Temperature: Ambient room and substrate temperatures must remain between +10 °C and +25 °C throughout.
• Layer Thickness on Floors: Applying thin coats is critical. Excessive film thickness on finish coats produces a softer surface with reduced mechanical load resistance.
• Movement Joints: Never bridge expansion, control, or structural joints in the substrate; honor them through the finish.

1. Characteristics and Tool Selection

Product Function

• Sttandard Microdeck: Two-component microcement with a medium-fine aggregate texture (grain size 0.2 mm). The standard choice for heavy-duty floors and walls.
• Natture M: Two-component lime-based microcement (grain size 0.2 mm). Provides superior surface hardness and natural concrete or tadelakt-style aesthetic effects.

Steel Trowel Selection

• Katana: Multi-purpose trowel for a balanced finish with moderate shade variation.
• Venetian Inox: Stiffer stainless steel trowel producing pronounced movement, metallic burnishing marks, and deeper tone shifts (ideal for darker colors).
• Bianco Flex / Plastic Trowel: Yields a calm, homogeneous surface without dark metallic burnishing lines (recommended for white and light colors).

2. Coverage and Mixing

Mixing Ratio (Based on 10 kg Powder)

• Sttandard Microdeck: Mix 10 kg powder with 3.0–3.5 liters Acricem Resin. Consumption: approx. 1.0 kg/m² total across 2 thin coats.
• Natture M: Mix 10 kg powder with 3.75 liters Acricem Resin. Consumption: approx. 1.0 kg/m² total across 2 thin coats.
• Layer Thickness: Apply thinly to grain thickness (max 1.0 mm per coat).

Mixing Sequence

1. Measure Acricem Resin into a clean bucket and add the color pigment. Stir thoroughly until the liquid reaches complete color uniformity.
2. Gradually introduce the powder while mixing continuously with a mechanical paddle mixer at low speed.
3. Mix for at least 4 minutes until you achieve a lump-free, creamy, and workable mortar.

Pot Life in Bucket

Mixed mortar remains workable for approximately 2–3 hours in the bucket depending on ambient room temperature and relative humidity.

3. Application and Workflow

Substrate Prep

The underlying base coat must be completely dry and sanded with 40 grit abrasive paper. Vacuum meticulously and wipe down the surface with a dry microfiber cloth to remove all sanding dust.

Coat 1

Trowel the material using a flexible steel trowel at an angle of approx. 45 degrees. Spread the material very thinly to grain thickness (max 1 mm), listening attentively for the scraping sound against the substrate. Work with multidirectional passes to create visual texture. Avoid leaving trowel ridges and imperfections during application.

Coat 2: Optional

Allow Coat 1 to dry for 3–4 hours. De-nib lightly with 80 grit abrasive, vacuum thoroughly, and apply Coat 2 thinly in the same manner.

Final Sanding Prior to Sealing

Meticulous finish sanding: Sand the surface smooth and uniform using finer grit abrasives. Sealers do not fill in defects; they accentuate any underlying surface flaw. Always inspect under bright raking light. Allow the surface to dry for 24 hours. Sand Microdeck with 80 grit abrasive on a sander (or 120 grit by hand). Vacuum and wipe the surface thoroughly with a dry microfiber cloth.

💡 Pro Tip for Sharp Internal & External Corners (Final Coat):
To easily execute crisp corners with Microdeck, mask off the corners on the 2 adjoining walls before applying the final coat to the active wall. Repeat the process on opposite walls.
• Remove masking tape immediately once the active wall is troweled.
• Direct a fan toward the finished walls for accelerated drying.
• Sand and re-tape: After 2–3 hours, sand the corner junctions on the cured walls, mask them, and apply the final coat to the remaining adjacent walls.
This technique works equally well on internal and external corners. While not mandatory, it significantly facilitates a flawless result.

4. Next Steps: Sealing and Topcoats

Option 1: Topciment Maximum Wear Resistance

Combine pore-filling primer TT Presealer with high-performance 2-component polyurethane sealer TT Topsealer Dragon.

Option 2: DC Titan Vapor Permeable

Combine penetrating primer Titan Presealer / Cream with breathable 2-component polyurethane sealer Titan Topsealer.

Documents and Technical Datasheets

📄 Technical Documentation: Sttandard Microdeck
🛡️ Health & Safety Equipment & Tool Care:
• Protective Equipment: Products contain cement and lime which can irritate skin and eyes. Wear protective gloves and safety goggles. Always wear respiratory protection (P2/P3) when handling dry powder and during all sanding stages. Ensure good ventilation throughout the workspace.
• Tool Cleaning: Clean tools thoroughly with water immediately after use before the mortar sets. For hardened material, clean tools using acetone or cleaning wipes.