FC - Application in Bathrooms (ENG)
The full Forcrete workflow for bathroom walls and floors, from preparation to sealer.
Updated
by tomas martinsson
Guide / Wetrooms
Forcrete — Step-by-Step & Tips for Bathrooms
Complete guide for build-up and workflow in bathrooms from surface preparation to sealing.
Select substrate for detailed preparations and primer:
🛑 Before the project begins:
• Sample Board: Always create a test sample measuring at least 60×60 cm in the chosen color and texture for client approval prior to starting.
• Drying Times & Ventilation: Forcrete is completely waterproof and airtight, meaning trapped moisture cannot evaporate outward later. Ensure strong ventilation and use fans so that every layer is fully dry before applying the next.
• Walk through all substrate conditions and imperfections with the client prior to beginning work.
• Sample Board: Always create a test sample measuring at least 60×60 cm in the chosen color and texture for client approval prior to starting.
• Drying Times & Ventilation: Forcrete is completely waterproof and airtight, meaning trapped moisture cannot evaporate outward later. Ensure strong ventilation and use fans so that every layer is fully dry before applying the next.
• Walk through all substrate conditions and imperfections with the client prior to beginning work.
🧪 Primer:
Always prime the substrate using the designated primer tailored to the substrate and selected build-up. Ensure the primer is thoroughly dry or fully cured before starting plaster application. In wetrooms featuring wall-adjacent linear drains, Forprime DPM must be used as the primer along connecting wall bases.
Always prime the substrate using the designated primer tailored to the substrate and selected build-up. Ensure the primer is thoroughly dry or fully cured before starting plaster application. In wetrooms featuring wall-adjacent linear drains, Forprime DPM must be used as the primer along connecting wall bases.
1. Bathroom Wall Build-up
Instructions: Apply Monostone XL (Wall) ↗
Instructions: Apply Microbase XT (Wall) ↗
Instructions: Apply Microquartz ↗
2. Bathroom Floor Build-up
Instructions: Apply Forprime HB/FL (Floor) ↗
Instructions: Apply Microbase XT (Floor) ↗
Instructions: Apply Microquartz ↗
3. Final Sanding & Sealing
Once the final coat of Microquartz has cured, sand all surfaces to the desired finish, vacuum thoroughly, and wipe with a microfiber mop prior to sealing:
4. Workflow & Day-by-Day Schedule
📑 Handover to end client: Always provide care and maintenance instructions to the client upon project completion to ensure the surface is maintained with recommended pH-neutral cleaning agents.
How did we do?
FC - Application on Decorative Surfaces (ENG)