FC - Application in Bathrooms
Craftsman Guide / Wet Rooms Forcrete — Step by Step & Application Tips for Bathrooms. Complete guide for system build-up, layer systems, and workflow in bathrooms from substrate preparation to sealin…
Updated
by tomas martinsson
Craftsman Guide / Wet Rooms
Forcrete — Step by Step & Application Tips for Bathrooms
Complete guide for system build-up, layer systems, and workflow in bathrooms from substrate preparation to sealing.
Select substrate for detailed preparations and primer:
🛑 Before Starting the Project — Sample Board Required:
• Always make a sample of at least 60×60 cm in the correct color and texture for client approval before starting.
• Drying Times & Ventilation: Forcrete is completely waterproof, which prevents moisture from escaping afterward. Keep doors open and use fans so each layer is 100% dry before starting the next.
• Review any site conditions and unevenness with the client before commencing work.
• Always make a sample of at least 60×60 cm in the correct color and texture for client approval before starting.
• Drying Times & Ventilation: Forcrete is completely waterproof, which prevents moisture from escaping afterward. Keep doors open and use fans so each layer is 100% dry before starting the next.
• Review any site conditions and unevenness with the client before commencing work.
🧪 Primer:
Always prime the surface with an appropriate primer based on the substrate and chosen base coat. Ensure the primer is thoroughly dry before troweling begins.
Always prime the surface with an appropriate primer based on the substrate and chosen base coat. Ensure the primer is thoroughly dry before troweling begins.
1. Build-up of Bathroom Walls
Instructions: Apply Monostone XL (Wall) ↗
Instructions: Apply Microbase XT (Wall) ↗
Instructions: Apply Microquartz ↗
2. Build-up of Bathroom Floors
Instructions: Apply Forprime HB/FL (Floor) ↗
Instructions: Apply Microbase XT (Floor) ↗
Instructions: Apply Microquartz ↗
3. Final Sanding & Sealing
Once the final coat of Microquartz has cured, sand all surfaces to the desired finish, vacuum thoroughly, and wipe down with a microfiber mop prior to sealing:
Instructions: Sanding Guide ↗
Instructions: Sealing & Topcoat (Coming soon)
4. Workflow & Day-by-Day Schedule
📑 Handover to End Client: Always provide care and maintenance instructions to the client upon finishing the bathroom so the surface is properly maintained with recommended pH-neutral cleaning agents.
How did we do?
FC - Application on Tiles
FC - Application: Decorative Surfaces