Skip to main content

FC - Substrate Preparation on Tiles (ENG)

Preparing wall and floor tiles before Forcrete: remove silicone, sand, fill the grout lines and skim until the surface is completely flat.

tomas martinsson
Updated by tomas martinsson
Guide / Preparation

Skimming Over Tiles & Pavers

Practical instructions on preparing and skim coating tiled walls and floor tiles prior to microcement application.

🛑 Before commencing the project:
‱ Because microcement only builds 2–4 mm in total, it will not bridge depressions or lippage. The surface must be completely flat with no telegraphing joints or raised edges upon completion.
‱ If the substrate is uneven, there is a substantial risk of ghosting where the grout grid pattern shows through, often becoming visible only after applying the final sealer.
‱ Always inspect for hollow sounding tiles (debonding) and patch defects prior to starting.
💡 Tips for skim coating:
Run a clean edge of the trowel over the surface just before the compound fully cures to scrape away ridges and burrs immediately. Cementitious repair mortars (e.g. Ardex A46) cure exceptionally hard and require extensive grinding if addressed later. Clean trowel application eliminates excessive sanding time.

1. Preparation per Substrate (Floors vs. Walls)

Workflow for Floor Tiles
‱ Remove silicone: Cut away all silicone sealants in corners and perimeter joints. Microcement does not adhere to silicone.
‱ Diamond grinding: Diamond grind tiles to key the glaze and level any lippage between tile edges.
‱ Standard joints: On most tiled floors, mechanical grinding is sufficient, as two coats of Forprime HB/FL will completely conceal the grout lines.
‱ Wide joints / Uneven floors: Pre-fill wide or deep grout lines using a cementitious repair compound (e.g. Ardex A46). For severely irregular substrates, apply a thin self-leveling screed.
Workflow for Wall Tiles
‱ Remove silicone: Cut out and remove all expansion and perimeter silicone joints prior to beginning.
‱ Diamond grinding: Diamond grind the wall tiles to key the surface and flush down misaligned edges.
‱ Fill joints: Pre-fill grout joints using a cementitious repair mortar. Draw the trowel diagonally across joints to pack them solid without pulling material back out.

2. Skim Coating & Sanding

Step 1: Scratch Skim Coat

Once joint filler has set, sand lightly. Apply a tight scratch coat across the entire wall or floor surface to render the substrate fully planar.

Step 2: Final Sanding

Sand the entire surface uniform and smooth, then vacuum thoroughly. Always trowel as cleanly as possible to keep subsequent sanding to an absolute minimum.

3. Exception for Large, Flush Wall Tiles

If wall tiles are large-format, perfectly flat, and feature tight, shallow joints, the pre-skimming stage may be bypassed:

‱ Following diamond grinding, prime the substrate with Monogrip and embed fiberglass mesh directly into Monostone XL.
‱ Important: This strictly applies to flush tiles with shallow grout lines. Otherwise, excessive thickness of Monostone is required to build the plane, which risks tension cracks in subsequent Microquartz layers.
‱ When finishing with Rockplaster, the build-up is more forgiving of thicker coats; however, pre-filling larger grout lines remains the recommended practice.
⏳ Drying Times: Repair mortars and leveling compounds must cure completely through before priming or applying microcement.

4. Next Steps

Select primer guidelines or proceed directly to application instructions for bathrooms:

How did we do?

FC - Reinforcement & Preparation (ENG)