TT - Application on Waterproofing Membranes (ENG)
How to prepare an approved wet-room waterproofing membrane for Topciment: drain grate, tile adhesive skim and primer.
Updated
by tomas martinsson
Guide / Wetrooms
Directly on Waterproofing Membranes: Application & Preparation
Guidance for floor drain grate installation, adhesive bed skimming, and surface preparation over waterproofing membranes.
🛑 Before commencing the project:
• Substrate Preparation & Cleanliness: Ensure the surface is sound, dry, and thoroughly cleared of dirt and grease.
• Working Temperature: Ambient and substrate temperatures must be maintained between +10 °C and +25 °C throughout installation and curing.
• Scope: This guide does not cover the installation of the waterproofing membrane itself, but details the preparatory workflow once an approved membrane system is certified in place.
• Recommended Systems: We recommend Kiilto or Zebra systems as they formally approve our products. Zebra provides detailed installation manuals and quality assurance documentation for microcement applications.
• Substrate Preparation & Cleanliness: Ensure the surface is sound, dry, and thoroughly cleared of dirt and grease.
• Working Temperature: Ambient and substrate temperatures must be maintained between +10 °C and +25 °C throughout installation and curing.
• Scope: This guide does not cover the installation of the waterproofing membrane itself, but details the preparatory workflow once an approved membrane system is certified in place.
• Recommended Systems: We recommend Kiilto or Zebra systems as they formally approve our products. Zebra provides detailed installation manuals and quality assurance documentation for microcement applications.
1. Installation & Moisture Protection of Floor Drain Grate
2. Tile Adhesive Skimming & Technique
3. Priming Prior to Microcement
How did we do?
TT - Application on Vinyl (ENG)
TT - Fiberglass Mesh & Reinforcement Guide (ENG)