Substrate Preparation: Application on Vinyl Sheet Flooring
Instructions for preparation, leveling transitions, floor drains, and application over existing vinyl sheet membranes.
🛑 Before commencing the project:
• Substrate Preparation & Cleanliness: Ensure the surface is sound, dry, and thoroughly cleared of contaminants and grease.
• Working Temperature: Ambient and substrate temperatures must be maintained between +10 °C and +25 °C throughout the installation.
• Condition of the Vinyl: Inspect the vinyl membrane thoroughly for damage, tears, or blisters. Check carefully around the floor drain and ensure wall upstands in corners are securely bonded without hollow voids.
• Substrate Rigidity: Soft, cushioned vinyl flooring is not recommended because substrate stability dictates the final outcome, and softer underlays substantially increase the risk of pressure dents from concentrated loads.
• Substrate Preparation & Cleanliness: Ensure the surface is sound, dry, and thoroughly cleared of contaminants and grease.
• Working Temperature: Ambient and substrate temperatures must be maintained between +10 °C and +25 °C throughout the installation.
• Condition of the Vinyl: Inspect the vinyl membrane thoroughly for damage, tears, or blisters. Check carefully around the floor drain and ensure wall upstands in corners are securely bonded without hollow voids.
• Substrate Rigidity: Soft, cushioned vinyl flooring is not recommended because substrate stability dictates the final outcome, and softer underlays substantially increase the risk of pressure dents from concentrated loads.
1. Preparation and Leveling Transitions
2. Floor Drain Grate Installation
3. Internal Corner Technique
4. Next Steps: Primers & Build-up