FC - Application on Self-Levelling Screed/Concrete Floors (ENG)

How to build up a Forcrete floor on concrete or self-levelling screed, from checking the substrate and priming to the finished surface.

tomas martinsson
Updated by tomas martinsson
Tradesperson Guide / Flooring

Application: Self-Leveling Screed & Concrete

Practical guide for the build-up and application of microcement on concrete and self-leveling screed floors.

Select substrate for detailed preparations and primer:
🛑 Before commencing the project:
• Sample Board: Always prepare a test sample of at least 60×60 cm in the correct color and texture for client sign-off.
• Substrate Inspection: Check moisture levels, cracks, and potential substrate movement thoroughly.
• Underfloor Heating: Underfloor heating must be turned off completely at least 24 hours before starting work.
• Always review any substrate defects with the client prior to starting.
💡 Considerations regarding reinforcement mesh:
We always recommend incorporating mesh; however, on stable, high-quality substrates, application can be executed without mesh to save time and installation steps.
• Mesh reinforces the cement matrix and minimizes the risk of micro-shrinkage cracking.
• Mesh cannot prevent structural settlement cracks or active substrate expansion joint movement.

1. Substrate Preparation & Crack Repair

1.
Grind the surface: Grind the substrate thoroughly with diamond tooling or 40-grit abrasive paper to remove laitance, loose contamination, and high spots. Vacuum the surface completely clean.
2.
Repair cracks: Chase and vacuum out all cracks. Fill and level with Forprime DPM mixed with quartz sand (stitch with crack ties/mesh if required). Note: When repairing cracks with Forprime DPM, it must cure overnight before applying EPST across the floor.

2. System Selection

Option 1: With Mesh Maximum Strength

Mesh-reinforced build-up. Optional final finish (Coarse, Medium, or Smooth).

1. Mesh: Spot-glue reinforcement mesh to the substrate using a glue gun.
2. EPST + Sand: Apply Forprime EPST and broadcast quartz sand to full saturation. Allow to cure.
3. Grinding: Sweep up and reclaim excess sand. Diamond grind smooth.
4. FL/HB + Sand: Apply Forprime FL/HB and broadcast quartz sand to full saturation. Allow to cure.
5. Grinding: Sweep excess sand, sand with 40-grit, and vacuum thoroughly.
6. Microquartz (Coat 1): Apply Microquartz Coarse.
7. Microquartz (Coat 2): Apply final coat of Microquartz (Coarse, Medium, or Smooth).
Option 2: Without Mesh Time Efficient

Fast-track build-up on flat, sound substrates. Coarse finish only.

1. EPST + Sand: Apply Forprime EPST and broadcast quartz sand to full saturation. Allow to cure.
2. Grinding: Sweep up and reclaim excess sand. Diamond grind smooth.
3. Microbase XT: Apply one coat of pigmented Microbase XT. Allow to dry.
4. Sanding: Sand the XT layer with 24- or 40-grit paper. Vacuum thoroughly.
5. Microquartz Coarse (Final Coat): Apply 1 coat of Microquartz Coarse. (Medium or Smooth cannot be used here as they do not provide adequate opacity over this base).

3. Final Sanding & Sealing

Once the final coat of microcement has cured, sand the surface evenly using 50–200 grit depending on the desired finish. Vacuum thoroughly and tack wipe the floor with a microfiber mop prior to sealing:

4. Workflow & Day-by-Day Schedule

Day
With Mesh (Option 1)
Without Mesh (Option 2)
Day 1
Grind substrate, repair cracks*, glue mesh, and apply Forprime EPST + sand broadcast.
Grind substrate, repair cracks*, and apply Forprime EPST + sand broadcast.
Day 2
Sweep sand, diamond grind, and apply Forprime FL/HB + sand broadcast.
Sweep sand, diamond grind, and apply pigmented Microbase XT.
Day 3
Sweep sand, sand (40-grit), and apply Microquartz Coarse Coat 1.
Sand XT (24/40-grit) and apply final coat of Microquartz Coarse.
Day 4
Intermediate sand Coarse Coat 1 and apply final coat Microquartz (Coarse/Med/Smooth).
Final sanding, thorough vacuuming, and application of topcoat sealer.
Day 5
Final sanding, thorough vacuuming, and application of topcoat sealer.
Complete (curing).

* Note: If cracks are repaired using Forprime DPM, the repair must cure overnight before applying EPST.

⏳ Curing & Traffic:
• Foot Traffic: The floor may be walked on carefully in socks after 24 hours.
• Furnishing: Do not place furniture on the surface for at least 5 days. Always fit protective felt pads.
• Covering & Rugs: Do not cover with rugs or protective paper/cardboard for at least 14 days, as the topcoat sealer requires airflow to complete its cross-linking cure.
• Water & Cleaning: Avoid exposure to water, liquid spills, or chemical cleaning detergents during the first 7 days.