FC - General Information About the Mixing App (ENG)
How to use the mixing app for Forcrete. The three parts of the app, consumption, pigmentation and mixing, are used in that order.
Forcrete — General Information About the Mixing App
Overview and guidance for the app's three functions: material coverage, pigmentation, and final mixing prior to application.
The App's Three Functions
Used to calculate the required material volume for a specific surface area (m²). Always begin here to determine consumption rates and calculate how much material needs to be weighed out for each individual layer.
Select your product and color to obtain the exact amount of pigment and water required for the powder (Component A). To ensure consistent, accurate color results, it is always recommended to pre-pigment full buckets.
Used at the time of application to calculate the exact amount of hardener (Component B) and any supplementary water. This tab is primarily used for partial mixes (e.g. when mixing 1/2 or 1/3 bucket at a time), but also works when fine-tuning the water ratio for full units.
Always pigment the material in advance and let it rest for at least 2 hours (preferably overnight). Smaller partial pigmentations should strictly be reserved for the initial base coat or sample boards, as smaller batches carry an increased risk of color variation.
How did we do?
FC - Mixing Cement Prior to Application (ENG)